How to Quote a Solar Panel Installation in Australia

A solar quote is really several quotes in one — panels, inverter, mounting, a switchboard that might need upgrading, and increasingly a battery. Here's how to itemise a solar install so a tricky roof doesn't wipe your margin.

A solar quote is several quotes in one: panels, an inverter, a mounting kit, the electrical work, a switchboard that might need upgrading, and — more and more often — a battery. Miss one line and a two-day job on an awkward roof can eat the profit. This guide walks through what a solar installation quote should itemise, what the parts and labour cost in 2026, and the errors that quietly cost sparkies money.

What a solar quote must itemise

Break a solar job into its parts and price each one — a lump sum hides the bits that catch you out. A clear quote separates:

  • Panels — brand, model and wattage, with the count and system size (kW) stated.
  • Inverter — string, micro or hybrid; a battery-ready hybrid costs more up front, so name it.
  • Battery (if included) — capacity in kWh and the model, on its own line.
  • Mounting and roof kit — priced to the roof type, since tile, tin and decramastic aren't the same job.
  • Electrical — wiring, conduit, isolators, safety switches and any meter box or switchboard upgrade.
  • STC rebate — shown as a separate discount, never buried in the base price.

Component and battery costs in 2026

A common residential system is 6.6kW — around 18 x 370W or 16 x 415W panels. Panels run $200–$350 per panel ex-GST, and the inverter and battery are your other big-ticket items. Pull live pricing from suppliers like Rexel or MM Electrical, because stock and rates move.

Typical solar component costs in 2026
ComponentTypical costNotes
Panel (per panel)$200–$350 ex-GSTVaries by brand, wattage and efficiency
String inverter$1,000–$2,500Sungrow, Fronius; sized to the array
Hybrid inverter$2,000–$4,000Battery-ready; costs more up front
Battery (10kWh)$8,000–$12,000 installedThe single biggest line on the job

Add mounting, wiring and a possible meter box upgrade on top. GST applies to the total — quote it clearly rather than surprising the customer at the invoice.

Labour, access and the site check

A standard 6.6kW system is about two tradies for one to two days. What blows that out is the roof and the access, so walk the site before you price it — allow 45 minutes for a proper look.

  • Roof type sets the pace: tile is quicker than corrugated iron or decramastic.
  • Two-storey or steep roofs add scaffolding and safety gear — often half a day on their own.
  • Shading from trees, chimneys or a neighbour's roof changes the panel layout and the output you can promise.
  • Roof condition — older roofs may need reinforcement before anything gets bolted down.
  • Switchboard and meter box — check there's room for the inverter feed and battery, and quote an upgrade if there isn't.

Warranties and compliance

Solar is a long-term purchase, so the warranties and the standards you install to are part of what you're selling. Spell them out.

  • Product warranty — panels 10–25 years, inverters 5–10 years, batteries around 10 years or a set cycle count.
  • Performance warranty — panels typically guarantee around 85% of output after 25 years; state it.
  • Workmanship warranty — your install, usually 5–10 years.
  • CEC-approved products only — panels, inverters and batteries must be on the Clean Energy Council list.
  • Standards — the install must meet AS/NZS 3000 (wiring), AS/NZS 5033 (PV arrays) and AS/NZS 4777 (grid connection); name the exact panel and inverter models so there's no doubt.

Common mistakes that undercut your profit

  1. Underquoting labour on a tricky roof. An extra half-day for scaffolding or difficult access can wipe the profit off a small system. Price the roof, not just the panels.
  2. Ignoring material price movement. Panel and inverter prices shift. Pull current pricing and put a short validity period — around 30 days — on the quote.
  3. No contingency for surprises. An asbestos find or an unexpected switchboard upgrade shouldn't come out of your pocket. Build in a 5–10% buffer.
  4. Vague inverter details. Leaving out the exact inverter and any optimisers invites scope creep. Name the model and spell out what's included.
  5. Forgetting the paperwork. Grid-connection applications, certifications and council permits are real costs. Leave them out of an 'all-inclusive' price and you're absorbing them.

Pro tips for a solar quote that holds

  • Specify exact panel, inverter and battery models in writing.
  • Price scaffolding and safety gear separately, especially on two-storey jobs.
  • Show the STC rebate as its own line so the customer sees the discount, not a mystery number.
  • Pull current supplier pricing the day you quote.
  • Carry a 5–10% contingency for site surprises.
  • Confirm roof type and condition on site — old roofs may need reinforcing first.

ServiceYak keeps your panel, inverter, battery and labour rates in a reusable kit, so you can build an itemised solar quote on the roof — STC discount and GST handled — and email the PDF before you're back down the ladder.

Frequently asked questions

How much does a 6.6kW solar system cost to install?

The parts drive it: panels at $200–$350 each ex-GST, plus the inverter, mounting and electrical. The STC rebate comes off the top as a discount. A 10kWh battery adds roughly $8,000–$12,000 installed, so a system with storage is a very different quote to one without.

Should I include a battery in the solar quote?

Only if the customer wants one, and always as a separate line. A 10kWh battery adds around $8,000–$12,000 installed, so quoting it inside the system price hides the biggest number on the job. A battery-ready hybrid inverter is a good middle option if they want to add storage later.

What standards does a solar install have to meet?

The core three are AS/NZS 3000 for wiring, AS/NZS 5033 for the PV array, and AS/NZS 4777 for grid connection, using only Clean Energy Council-approved products. Name the exact panel and inverter models in the quote so compliance is clear.